#71503: "A lot more automation in production phase through pre-planning"
Despre ce este vorba acest raport?
Ce s-a întâmplat? Te rugăm alege de mai jos
Ce s-a întâmplat? Te rugăm alege de mai jos
Verificați dacă există deja un raport privind același subiect
Dacă da, te rugăm VOTEAZĂ pentru acest raport. Rapoartele cu cele mai multe voturi au PRIORITATE!
| # | Status | Votes | Game | Type | Title | Last update |
|---|
Descriere detaliată
-
• Te rugăm copiază/lipeşte mesajul erorii pe care îl vezi pe ecran, dacă apare vreunul.
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
-
• Explică, te rugăm, ce ai vrut să faci, ce ai făcut, și ce s-a întâmplat
• Care e browserul tău?
Google Chrome v102
-
• Va rugam copiati/lipiti textul afisat in engleza in locul limbii dumneavoastra. Daca aveti un screenshot pentru acest bug (o practica buna), puteti folosi un servise the host pentru poze la alegerea dumneavoastra (snipboard.io for example) pentru a incarca si a copia/lipi linkul aici. Este textul acesta disponibil în sistemul de traduceri? Dacă da, a fost tradus mai recent de 24 de ore?
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
• Care e browserul tău?
Google Chrome v102
-
• Vă rugăm să explicați sugestia exact și concis, astfel încât să fie cât mai ușor de înțeles.
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
• Care e browserul tău?
Google Chrome v102
-
• Ce a fost afișat pe ecran atunci când ai fost blocat (Ecran gol? O parte din interfața jocului? Mesaj de eroare?)
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
• Care e browserul tău?
Google Chrome v102
-
• Care parte din reguli nu a fost respectată de adaptarea BGA
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
-
• Se observă frauda când derulați reluarea? Dacă da, la a câta mutare?
• Care e browserul tău?
Google Chrome v102
-
• Care a fost acțiunea pe care ai vrut să o faci?
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
-
• Ce ai făcut de ai produs această reacție/eroare?
-
• Ce se întâmplă atunci când vrei să faci asta (apare o eroare, un mesaj din partea jocului in partea de sus a ecranului, ...)?
• Care e browserul tău?
Google Chrome v102
-
• În ce etapă a jocului a apărut eroarea (care era instrucțiunea din acel moment) ?
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
-
• Ce se întâmplă atunci când vrei să acționezi în joc (apare o eroare, un mesaj din partea jocului in partea de sus a ecranului, ...)?
• Care e browserul tău?
Google Chrome v102
-
• Descrieți, vă rugăm, problema de afișaj. Daca aveti un screenshot pentru acest bug (o practica buna), puteti folosi un servise the host pentru poze la alegerea dumneavoastra (snipboard.io for example) pentru a incarca si a copia/lipi linkul aici.
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
• Care e browserul tău?
Google Chrome v102
-
• Va rugam copiati/lipiti textul afisat in engleza in locul limbii dumneavoastra. Daca aveti un screenshot pentru acest bug (o practica buna), puteti folosi un servise the host pentru poze la alegerea dumneavoastra (snipboard.io for example) pentru a incarca si a copia/lipi linkul aici. Este textul acesta disponibil în sistemul de traduceri? Dacă da, a fost tradus mai recent de 24 de ore?
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
• Care e browserul tău?
Google Chrome v102
-
• Vă rugăm să explicați sugestia exact și concis, astfel încât să fie cât mai ușor de înțeles.
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
• Care e browserul tău?
Google Chrome v102
Raportează istoric
This could be auto-placement of produced cube if there is only one card that needs it.
Or we could set *one* card to auto-build in priority and cubes would automatically go to it.
Adaugă ceva la acest raport
- Alt identificator de masă / de mutare
- A rezolvat F5 problema?
- Această problemă a apărut de mai multe ori? De fiecare dată? Ocazional?
- Daca aveti un screenshot pentru acest bug (o practica buna), puteti folosi un servise the host pentru poze la alegerea dumneavoastra (snipboard.io for example) pentru a incarca si a copia/lipi linkul aici.
